Black Diamond Trail bridge over the flood control channel looks like it's happening

Special thanks to Tim Logue, FLRC board member and Director of Engineering for the City of Ithaca, for pushing this project through. Perhaps by next fall, we’ll be able to run all the way from Taughannock to Buttermilk.

1 Like