I’ve edited the RunGo directions to use the Rail Trail connector now—sorry for the delay. I think it’s more like 7.2 now, but we’ll wave our hands at that for now, since it will change again after the bridge construction is done.
I’ve edited the RunGo directions to use the Rail Trail connector now—sorry for the delay. I think it’s more like 7.2 now, but we’ll wave our hands at that for now, since it will change again after the bridge construction is done.